A passionate team that’s going to move

Engelandlaan (3)

New construction

At the start of 2018, Maastricht Airport was consciously chosen as the location, given its ideal geographical location with, in addition to Maastricht Airport, the airports of Liège, Brussels, Amsterdam and Frankfurt almost “around the corner”. Dutch and German forwarders in particular make use of MLS as an extension of Liège airport, which is approximately 40 kilometers from MLS. The current building has become too small and MLS will therefore move in Q4 2024 to a completely new, sustainable office (1,200 m2) and warehouse (13,000 m2) developed for MLS at Aviation Valley, Maastricht Airport.

New address as per Q4-2024:
Maastricht Logistics Services BV
Engelandlaan 15
6199 AN Maastricht-Airport
Netherlands

bouw 2
Start of the construction 12-2023
bouw 3
Drilling first foundation pile

The new building is built entirely according to BREEAM sustainability standards. The handling, cross-dock and storage activities will take place in a 13,000 M2 warehouse, with 15 docks, one of which will have a large overhead door and two will be equipped with a 10 foot and 20 foot dock lift for (un)loading ULD's. There will be facilities for keep cool storage as well as the installation of several lower down workstations for 10 foot ULD's, in particular to optimize the handling of ULD's with cartons (E-commerce).

bouw 10
Loading docks
bouw 5
ULD Lowering workstations
Our success comes from our highly motivated staff members, who not only go the extra mile by saying so, but who practice this every single day, 12 month a year! We call our company Maastricht logistics SERVICES!

Figures

  • 13.000 M2 Warehouse
  • 15 (un)loading docks
    • 1 dock for oversized loading
    • 12 (un)loading docks
    • 1 10FT ULD (un)loading dock
    • 1 20FT ULD (un)loading dock
  • 3 10FT lowering workstations
  • storage facility for 150 build-up PMC's
  • keep cool storage
  • bonded warehouse
  • TAPA certified
  • AEO certified
  • BREEAM build building 
MLS: Building the new Warehouse - pt. 3 Constructing Steel Framework
MLS: Building the new Warehouse - pt. 4 Framework in progress